93乱子伦国产乱子伦海的味道I久久久无码精品I日韩精品免费在线I国产精品资源网I67194午夜I99久久99久久99久久久99国产I午夜精品久久久久久久爽嫩草I国产一级淫片免费看I久久任你操I色吊丝永久网站I鲁一鲁国产不卡区I九九热久久免费视频I538在线精品I影音先锋资源共享I亚洲国产网站I91A欧美电影网站I在线www色I一区二区影院

Media
Shen shun gao attended the meeting of the standard unit in the maintenance base of nanhang Beijing new airport
Source:不詳????Update:2017/4/24 14:39:18????FontSize:【L??M??S


001.jpg

On April 21, the company's general manager, shen shun gao, attended the meeting of the bid center of the construction headquarters of the new airport in Beijing. During the meeting, the headquarters for the chief engineer dong-ming zheng this paper expounds in detail the design technical requirements, secretary of the commission for discipline inspection seal chi-wai do to honest work focus, the commander wang do summary statement to the overall requirement of the project, asking the design unit attaches great importance to the political thought, into a good soldier character, efforts will build the new airport project into a practical project southern Beijing benchmarking project. The meeting was presided over by lu junhong, the party secretary of the headquarters.


Shen Shun high on behalf of the company to receive the letter of acceptance in the project, his first thanked China southern to the company's long-term support trust, stressed that will set the whole company strengths to ensure the smooth implementation of the new airport project, China southern Beijing with high sense of responsibility will become a high-quality goods China southern Beijing's new airport base construction engineering, template engineering, safe clean engineering, thus contributing to the construction of China southern airlines guangzhou, Beijing double hub catic should be responsibility.


China southern Beijing airport base includes five parts: maintenance maintenance, air cargo, airline catering, production operation logistics facilities, with a total construction area of 1.09 million square meters, the company to undertake maintenance efficiency of plot construction area of about 207000 square meters. The hangar span is 183m+ 222m, with a limit of 40m to satisfy two a380s three B777 aircraft in warehousing maintenance. After completion, the project will become the largest hangar in the country. The design period of this project is 90 days, the on site design is closely connected with the headquarters.